In the power system, voltage transformers (PTs) play an important role in voltage conversion and isolation, and their performance directly affects the accuracy of measurement and the reliability of relay protection actions. Faced with a wide variety of PT testing equipment in the market, how to make reasonable choices based on actual needs is a problem that every power tester must face. Based on the 22 years of technical accumulation and product practice in the field of high-voltage electrical measurement by Wuhan UHV Power Technology Co., Ltd., this article summarizes the key considerations for selecting PT testing equipment four dimensions: testing requirements, accuracy indicators, application scenarios, and intelligence level.

CT PT Tester

Clearly define the test object and core functional requirements

The first step in selection is to clarify the type of device being tested and the testing items that need to be completed. PT testing involves multiple parameters such as transformation ratio, polarity, ratio difference, angle difference, secondary direct resistance, no-load loss (excitation current), and secondary circuit load. The UHV-109A CT PT tester for Wuhan UHV covers all the testing requirements mentioned above, supporting detection and protection, measurement CT/PT, without the need for external auxiliary equipment, and can complete all testing projects on a single machine. The PT ratio measurement range can reach 500kV, and the CT ratio measurement range can reach 25000A/5A, which can meet a wide range of testing scenarios distribution to transmission levels.


The accuracy level must match the measured transformer

Accuracy is a key indicator in the selection of PT testing equipment. The accuracy of the calibrator itself must be much higher than the accuracy level of the tested transformer. For example, when calibrating a 0.2 level transformer, the accuracy of the calibrator should be at least 0.05 level or higher. The excitation accuracy of UHV-109A is controlled at ≤ 0.5% (0.2% x reading+0.3% x range), the phase measurement (angle difference) accuracy reaches 4 minutes, and the resolution is 0.1 minutes.


Test scenarios determine device form

The requirements for equipment in laboratory fixed testing and on-site testing in substations are completely different. Fixed laboratories can choose desktop systems with more comprehensive functions and stronger output capabilities, while on-site operations require higher requirements for equipment portability, power supply methods, and environmental adaptability. Wuhan UHV fully considers the practical difficulties of on-site use when designing products - the UHV-109A CT PT tester machine weight is controlled within 22kg, with intelligent prompts and large screen graphical display, suitable for mobile operations in substations. Addressing the pain points of complex equipment, large size, and long preparation time in on-site calibration of voltage transformers.


Automation and data management capabilities cannot be ignored

Modern PT testing equipment has evolved manual operation to fully automatic direction. The fully automatic testing function means that the operator only needs to complete the wiring, and the equipment can automatically boost, sample, draw curves, and automatically calculate 5% and 10% error curves, greatly reducing human error. In terms of data management, UHV-109A CT PT tester can store 3000 sets of test data, support USB transfer and generate WORD reports, and comes with a micro fast printer that can directly print results on site. For power maintenance units and testing institutions that require long-term archiving of test reports, such functions significantly improve work efficiency. In addition, the automatic demagnetization function should also be considered in the selection process - if demagnetization is not carried out in a timely manner after CT excitation test, residual magnetism may affect the accuracy of subsequent measurement results.


Validate selection criteria through practical application

Whether the equipment selection is reasonable ultimately needs to be verified through practical application. In 2026, Wuhan UHV won the bid for the testing instruments and equipment section with the highest comprehensive ranking in the fourth centralized bidding and procurement of materials by State Grid Shaanxi Electric Power Co., Ltd. The winning equipment includes multiple core equipment for power grid testing, such as circuit resistance testers, transformer withstand voltage and partial discharge testing equipment, and fully automatic insulation oil dielectric strength testers. After the batch of equipment is put into use, it will be used to improve the accuracy and efficiency of equipment detection in Shaanxi power grid, and strengthen the safe and stable operation capability of regional power grid. This case indirectly confirms a selection logic: instead of chasing the highest indicator on the parameter table, it is better to return to the three fundamental questions of "what to measure, where to measure, and how much accuracy is required" and choose products that truly match their own detection tasks.