HuaTianLogo

News center / News

news

Wuhan Zhongnan Construction Department

time:2025/5/30  reading:1864 time

The leaders of the Central South Construction Department, led by Manager Wu from the Sales Department, visited our company's production workshop, quality inspection department, technical research and development room one by one. In the conference room, Mr. Li, Mr. Li from the Technology Department, Mr. Yi from the Production Department, and Manager Wu from the Sales Department had in-depth introductions and exchanges with leaders from the Municipal Department of Construction.  

70007.jpg

Mr. Li first introduced the development history and planning of our Wuhan UHV system, and had a thorough communication with the department leaders regarding our self-produced power testing products. Subsequently, Li gave a detailed performance description of the UHV-5600 dual clamp multifunctional grounding resistance tester, UHV-341 fully automatic anti-interference and abnormal frequency dielectric loss tester, UHV-300 CT volt ampere ratio polarity comprehensive tester, UHV-801 large-scale grounding resistance tester, which were of interest to the leaders of the Construction Department. Yi Gong conducted on-site testing demonstrations.  

Throughout the visit, the leaders of the Central South Construction Department nodded frequently and gave full recognition and evaluation to our company. This visit and inspection deepened the understanding of Wuhan Huatian Electric Power by the Municipal Department of Construction, and enhanced the confidence of the city leaders in cooperation with our company!


Wuhan UHV
2025/5/30
Copyright description: all articles, pictures, video and other materials on this site belong to Wuhan UHV Power Technology Co., Ltd. For use, please contact us; Permission to reprint articles, pictures, video and other materials please quote "from: huatian power".
 

Fushun Metrology and Testing Institute  | 2025/6/3 | reading1840time Wuhan UHV products have been recognized  | 2025/5/30 | reading1866time return